cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota medan,
Sumatera utara
INDONESIA
JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING
Published by Universitas Medan Area
ISSN : 25496328     EISSN : 25496336     DOI : -
Core Subject : Engineering,
JIME (Journal of Industrial and Manufacturing Engineering) is a journal of scientific work in the Industrial Engineering Study Program, Faculty of Engineering, Medan Area University which presents research results in the fields of Manufacturing, Ergonomics, and Industrial Management. The accepted journal is expected to be related to increasing productivity and current issue
Arjuna Subject : -
Articles 5 Documents
Search results for , issue " Vol 1, No 2 (2017): EDISI NOVEMBER" : 5 Documents clear
Hubungan Motivasi dengan Produktivitas Karyawan di PT. Srikandi Inti Lestari Polewangi, Yudi Daeng; Utomo, Budi
JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING Vol 1, No 2 (2017): EDISI NOVEMBER
Publisher : Universitas Medan Area

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (995.277 KB) | DOI: 10.31289/jime.v1i2.2334

Abstract

Motivation is very important to be considered by the management if they want every employee make a positive contribution to achieve the corporate goals. Given the importance of motivation, the attention of management regarding to problem of employee motivation is to motivating employees in the company through a series of specific businesses in accordance to company policy, so the employees motivation will be maintained. This study to determine the relationship of motivation with employee productivity at PT. Srikandi Inti Lestari. The results describe employees of PT. Srikandi Inti Lestari has a high motivation and work productivity. Given the distribution of respondents' answers to the biggest motivation questions that agree 50%, strongly agree 20%, hesitate 18%, disagree 12% and strongly disagree 0%. Distribution of respondents' answers to the largest productivity question that is 46% agree, strongly agree 28%, hesitate 18%, disagree 8% and strongly disagree 0%. Based on this it is clear that the relationship between motivation and employee productivity in PT. Srikandi Inti Lestari influence each other with the value of 46% for productivity and 50% for motivation.
Penerapan Metode Peramalan Produksi dan Perencanaan Kebutuhan Bahan Baku Dengan Metode Material Requirement Planning di PT.CJ Feed Medan Alrahman, Yufri; Mustafa, Kamil; Delvika, Yuana
JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING Vol 1, No 2 (2017): EDISI NOVEMBER
Publisher : Universitas Medan Area

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1072.766 KB) | DOI: 10.31289/jime.v1i2.2335

Abstract

PT. CJ Feed Medan is a engaged in the animal feed industry. The purpose of this study is to determine the amount of GM-1C feed production from the forecasting of the number of sales of animal feed products of the previous type. And to plan raw material inventory for production of GM-1C animal feed with Material Requirement Planning method. Forecasting is a process to estimate the level of some future needs that include the needs in quantity size, quality, time and location required in order to meet the demand for goods or services. Material Requirement Planning is a logical procedure, decision rule and computerized records engineering designed to translate master production schedules or MPS (Master Production Scheduling) into Net Requirements for all items or components. From good sales data forecasting method is cyclical method because it has the smallest SEE value. So it can be estimated sales of the last 10 days in October 2017 as much as 70782, 70143, 69266, 68210, 67049, 65860, 64725, 63720, 62915 and 62365. The last process to get data on raw material needs is the making of MRP report. This report is a comprehensive report of the raw material requirements for GM-1C products.
Penjadwalan Perkuliahan Dengan Metode Vertex Graph Coloring Dan Simulated Annealing Silitonga, Anggi Natanael; Apdillah, Dicky
JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING Vol 1, No 2 (2017): EDISI NOVEMBER
Publisher : JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (925.298 KB)

Abstract

In college, lecture scheduling is very important in lecturing process, because the activities of lecturers and students depend on lecture schedule. To solve the problem, use Vertex GraphColoring and Simulated Annealing. In Vertex Graph Coloring, look for neighboring and neighboring vertices. While on Simulated Annealing, look for space and exchange positions randomly. The merger of Vertex Graph Coloring and Simulated Annealing aims to create optimum lecture schedule by looking at hard constraint and soft constraint. Testing is done at Faculty of Pharmacy University of North Sumatra, by making schedule from manual to computerized, so it is expected to make the schedule optimally and able to avoid hardconstaint and soft constraint.
Analisa Tingkat Kebisingan terhadap Karyawan di Lingkungan Kerja Kantor PT. Surveyor Indonesia Cabang Medan Sahab, Muhammad Fahmi; Banjarnahor, Muhammad; Hasibuan, Chalis Fajri
JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING Vol 1, No 2 (2017): EDISI NOVEMBER
Publisher : JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (966.74 KB)

Abstract

Noise is all unwanted sounds to some degree cause hearing loss. In the operation of PT.Surveyor Indonesia laboratory operation using some machines that cause noise that disrupt the workers. From result of research of noise level happened 68.93-89.12 dB and already exceeded the threshold in accordance with regulation of KEP-48 / MENLH / 11/1996. From the results of questionnaires distributed with the number of respondents 30 people. Tested the validity, reliability, and multiple linear regression analysis. The result of validity test value 0.631-0.944 this value> from r table value 0.361 can be summed up all valid questions. The reliability test results of 0.601-0.908 this value> of the cronbach alpha value of 0.600 can be summed up all reliable questions. Result of linear regression analysis obtained equation Y = -0.321-0.031-X1 + 0.076X2 + 1.114X3. Where X1 = communication, there is a negative relationship, X2 = physiology, positive relationship occurs, X3 = Psychology positive relationship occurs. The results of double correlation analysis test R = 0.701 this shows a strong relationship between noise to communication, physiology and psychology. And the result of coefficient test of regresi together with test F, obtained F arithmetic 8,392 and F table 2,975 so F count> F table thus Ho rejected Ha accepted meaning there is influence signifikan between noise to communication, physiology and psikolgi worker.
Perencanaan Kapasitas Produksi Crude Palm Oil Menggunakan Metode Rough Cut Capacity Planning (RCCP) Di PT. PP Londonsumatra Indonesia Tbk, Turangie Palm Oil Mill haniza, haniza
JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING Vol 1, No 2 (2017): EDISI NOVEMBER
Publisher : Universitas Medan Area

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (874.946 KB) | DOI: 10.31289/jime.v1i2.2324

Abstract

Permintaan terhadap Crude Palm Oil bervariasi setiap bulannya sehingga perusahaan melakukan peramalan (forecasting) permintaan produk yang akan datang. Berdasarkan data PT. PP Londonsumatra Indonesia Tbk Turangie Palm Oill Mill selalu menerima pesanan konsumen tanpa mempertimbangkan kapasitas tersedia. Penelitian ini bertujuan menghitung kapasitas teresedia terhadap kebutuhan kapasitas berdasarkan metode Rough-Cut Capacity Planning (RCCP). RCCP adalah suatu proses analisis dan evaluasi kapasitas dari fasilitas produksi yang tersedia di lantai pabrik agar sesuai atau dapat mendukung jadwal induk produksi (JIP) yang akan disusun. Berdasarkan laporan RCCP kapasitas tersedia stasiun reception terjadi kekurangan kapasitas pada setiap periode mulai dari Oktober 2017 – September 2018. Pada stasiun sterilizer terdapat kekurangan kapasitas tersedia pada setiap periode mulai dari Oktober 2017 – September 2018. Pada stasiun thressing dan pressing diketahui bahwa kapasitas tersedia sudah dapat memenuhi kebutuhan kapasitas yang direncanakan. Untuk mengatasi kekurangan kapasitas sterilizer pada periode Oktober 2017 – September 2018 diusulkan alternatif keputusan berupa penambahan jam kerja (shift kerja).

Page 1 of 1 | Total Record : 5